Asphalt cut to open the tie-in

Project Description

Client:   Zip Kit Homes
Location:   Victor, Idaho
Year Completed:   2024

This project included running approx 300-ft of sewer line from a multi-unit building to the City of Victor sewer mainline. This line had to be installed along the property line due to existing buildings on property. We had to cut and repair the city stormwater piping.

The Challenges

This installation was very difficult. It started with Engineering providing plans that included sewer routing that did not meet code. We had to re-route the line around the back of the facilities and tie into the sewer mainline 300-ft away.