- Prepping the excavation area
- Asphalt cut to open the tie-in
- Digging even when winter hits
- Excavating the tie-in
- Unmarked utilities
- Cutting thru the storm drains
- Hydrovac to complete expose the tie-in
- Laying sewer line
- Foam insulation for sewer lines
- Bringing the sewer to the unit
- Installation of sewer line
- Getting the slope of the sewer line right
- Crossing utilities
Project Description
Client: Zip Kit Homes
Location: Victor, Idaho
Year Completed: 2024
This project included running approx 300-ft of sewer line from a multi-unit building to the City of Victor sewer mainline. This line had to be installed along the property line due to existing buildings on property. We had to cut and repair the city stormwater piping.
The Challenges
This installation was very difficult. It started with Engineering providing plans that included sewer routing that did not meet code. We had to re-route the line around the back of the facilities and tie into the sewer mainline 300-ft away.