![IMG_2044 Checking final grade](https://marleneellc.com/wp-content/uploads/2022/04/IMG_2044-1130x400.jpeg)
- Project prior to starting
- Project prior to starting
- Project prior to starting
- Starting to clear route
- Establishing route
- Establishing route
- Overburden management
- Overburden management
- With the topsoil removed, its’ time to start working on grade
- With the topsoil removed, its’ time to start working on grade
- Controlling Erosion / Ditches
- With the topsoil removed, its’ time to start working on grade
- Initial grade set
- Initial grade set
- Initial grade set
- Spreading pit-run
- Checking final grade
- Final Grade!
- Check out this cool moose that visited us every day!
Project Description
Client: J. Plummer
Location: Victor, ID
Year Completed: 2021
The Challenges
Customer needed a construction-access road (and foundation for permanent road) constructed to his property. Cut away hundreds of yards of overburden. Surveyed grade to maintain <10% grade. Installed 12-inches of pit-run. Installed drainage ditches.