- Foundation Excavation
- Building the floor for the water storage tank
- Installing the R-Tank
- Setting rough grade
- Repairing storm drains
- Repairing storm drains
- Tie-in of stormwater drains
- Installation of man-holes
- Asphalt prep with inspection ports
Project Description
Client: Zip Kit Homes
Location: Victor, Idaho
Year Completed: 2024
This project included the excavation and installation of a stormwater management system in Victor Idaho. This stormwater management system used the R-tank style retention tank. This installation included the installation of two man-holes, inspection ports, and approximately 300 feet of 6-inch drain line.
The Challenges
This installation was difficult because of the tight space. The excavation footprint was encapsulated with power and fiber utilities while encroaching on the foundation.