Connecting new well for fire suppression pond

Connect New Well for Fire Suppression Pond

Project Description

Client:  Nate Moesteller
Location:   Driggs, ID
Year Completed:   2022

The Challenges

After drilling a new well, we needed to connect the well to power and pipe the outflow to a fire suppression pond.

Ditch prior to Cleanup

Ditch Cleanout

Ditch prior to Cleanup

Project Description

Client:  Mike Hicks
Location:   Idaho Falls, ID
Year Completed:   2022

The Challenges

Cleaned out and re-built a mile of agricultural ditch/waterway/canal. Used laser telemetry to verify ditch. Excavated over two feet of silt in some places. Removed trees from problematic areas. Rebuilt corners with rip-rap. Our large 5-ft bucket makes this a breeze!

Image of a level, smooth floor

Re-grade Potato Cellar & Shave Walls

Image of a level, smooth floor

Project Description

Client:   Stolworthy Farms
Location:   Shelley, ID
Year Completed:   2022

The Challenges

This customer wanted a complete update of a potato cellar that is also used for hay storage. We shaved the walls down by approx 4 feet on each side to prepare the building for shot-crete. Then, when the walls were finished, we took about 2 feet out of the floor. This project increased hay storage by 33%. During the project, we had to work against cave-ins, slough-offs, and poor stability.

Ditch cleanout on plot of land

Demolish Building, Concrete Prep, Ditch Cleanout, and Driveway Resurface

Ditch cleanout on plot of land

Project Description

Client:   Allen Miller
Location:   Rigby, ID
Year Completed:   2022

The Challenges

Build pad and prep for concrete (15′ x 30′). Demolished old outhouse building (rescued for another client). Cleanout ditches.

Demolish Building, Remove Trees, Cleanout Ditch

IMG_1641

Project Description

Client:   A. Miller
Location:   Rigby, ID
Year Completed:   2021

The Challenges

Trees had overgrown ditch and were preventing flow. Removed them without compromising ditch.

Demolished rock building and foundation. Backfilled with pit run, compacted and prepped to build a concrete pad.

Replaced outdated irrigation gates

Re-sod impacted area.